快乐时时彩

服务热线

15858278967

News center新闻中心

  • EPS线条的生产步骤及施工注意事项
  • 本站编辑:杭州临安田园建材有限公司发布日期:2019-08-07 11:54 浏览次数:

EPS线条初步加工完成后,操作人员接下来会将这些线条统一检查,看看是否存在瑕疵,如果有缺陷需要进行修补,然后归类整齐存放,具体步骤如下:

After the preliminary processing of EPS lines is completed, the operators will check these lines uniformly to see if there are any defects, if there are defects need to be repaired, and then classify and store them neatly. The specific steps are as follows:

具体操作步骤:

Specific operation steps:

一、成品的养护、修补码放

I. Maintenance and Repair of Finished Products

2-16122P93955-lp.jpg

1.生产线下来的半成品,手、身体不能接触抹灰面,轻拿轻放,整齐、平直地码放在半成品支架上,保持平、直、整齐不使线条变形。

1. Half-finished products from the production line, hands and bodies can not touch the plastering surface, light handle, neat, flat code on the semi-finished product bracket, keep flat, straight, neat and do not make the line deion.

2.一般在一天左右,不要去搬动和接触线条,在常态进行养护,特殊要求的酌情对待。

2. Generally in a day or so, do not move and contact lines, in the normal maintenance, special requirements of the discretionary treatment.

3.二次抹灰完成后一天左右,对生产的成品线条进行质量检查,小的缺陷要有专人进行精心修补,修补的外观应与线条外观一致。大的缺陷报废。

3. About one day after the completion of the second plastering, the quality of the finished product lines should be checked. The minor defects should be carefully repaired by specialists. The appearance of the repaired lines should be consistent with the appearance of the lines. Large defects are scrapped.

二、线条切割、包装

2. Line Cutting and Packaging

1.养护到期的产品需对外观进行检查,有缺陷的应作为次品,不能出厂。

1. Maintenance of expired products need to be inspected for appearance, defective products should be treated as inferior products, can not leave the factory.

2.产品的端部要进行切割,剖面要与线条垂直、剖面光滑。

2. The end of the product should be cut, and the profile should be vertical to the line and smooth.

3.出厂的产品表面光滑、颜色一致、无污染、无缺陷、剖面光洁,包装、码放整齐,编号、批次、生产日期、定单号、数量、合格证、防雨、易碎等标示应齐全。

3. The finished products should have smooth surface, uniform color, no pollution, no defect, smooth profile, neat packing and code, complete labeling such as number, batch, production date, order number, quantity, certificate, rain proof, fragility, etc.

EPS线条施工时需要注意的事项:

The matters needing attention in EPS line construction are as follows:

施工时环境温度应在5-38度之间,低于此温粘结砂浆 必须采用抗冻配方,风力不大于5 。

During construction, the ambient temperature should be between 5 and 38 degrees. When the temperature is lower than this, the frost-resistant formula must be adopted for bonded mortar, and the wind force is not more than 5 degrees.

拼装时,拼装缝应尽量留于整根EPS构件中间部位。

When assembling, the assembling seam should be reserved in the middle part of the whole EPS component as far as possible.

刚粘结的EPS线条构件应注意保养,防止雨水冲刷、人为损坏等。

The rigidly bonded EPS line components should be carefully maintained to prevent rainwater scouring and man-made damage.

所有材料必须由现场质量人员进行自检,检验合格后方可使用。

All materials must be self-checked by the quality personnel on site, and can be used only after passing the inspection.

熟悉施工图纸,组织工人进行施工程序和要点的交底,保证施工按要求进行。

Familiar with construction drawings, organize workers to submit the construction procedures and key points to ensure that the construction is carried out as required.

施工结束后,EPS装饰线条严禁蹬踏、撞击,如有损坏,应将整块线条拆下来重新安装。

After construction, pedaling and impact of EPS decorative lines are strictly prohibited. If damaged, the whole line should be removed and reinstalled.


友情链接:港龙彩票  98彩票官网  鸿利彩票  博乐彩票  98彩票  98彩票网  广发彩票网  

免责声明: 本站资料及图片来源互联网文章,本网不承担任何由内容信息所引起的争议和法律责任。所有作品版权归原创作者所有,与本站立场无关,如用户分享不慎侵犯了您的权益,请联系我们告知,我们将做删除处理!